EV chargers
Garage EV charger with load management
A Level 2 charger added without a panel replacement, using load management to stay within the existing service.
Location
Arvada
Home
1990s two-story
Time on site
Single visit
Scope
Load calculation, dedicated circuit, charger mounting, load management

01
The challenge
The homeowners wanted fast overnight charging, but their 150-amp panel had limited spare capacity.
02
Our approach
After a load calculation, we installed a dedicated circuit with a load management device that reduces charging when household demand peaks. The charger was mounted beside the parking spot with a short, protected wire run.
03
The outcome
Reliable overnight charging, no panel replacement, and a garage wall that looks finished rather than improvised.